Q&A

Modinex's advantage is that it can be compatible with any equipment. If you want to change the position after installing a hole in the existing ceiling, the Modinex ceiling configuration can be moved neatly without any trace even when changing the position.

The fundamental key to low cost is labor costs. The module itself is made of more expensive materials and is highly constructed.

Our own structural stiffness tests showed superior results than conventional stud structures.

Since the module is filled with utilities, I am confident that it is functionally superior.

When installing the ceiling module, you can remove it and reinstall it at the desired location after installing the ceiling module.

All modules can be customized and arranged except for architectural installation restrictions (ex gas, power distribution box, fixed large obstructions, etc.).

From the user's point of view, 1. possible price, 2. rapid construction, 3. freedom of structural change according to future changes, 4. stable structure and solid physical properties, 5. minimal dust and pollution discharge during renovation. Additionally, the management will continue to manage and maintain.

There have been many operating rooms for patients until now.

Modinex is the first product that considers the health and working environment of medical professionals such as doctors and nurses.

There are cases where the plan needs to be changed rather than impossible.

For example, If the frame of the building is too weak, it may require reinforcement.

If the heating and cooling facilities are inadequate, improvements related to heating and cooling will be carried out together. (Extension of construction period)

After design approval, it will take about 10-20 days for production and 

7-10 days for installation business days, based on a 8 pyeong operating room.

Specific on-site inspection and meeting are required for the installation and construction of Modinex's products, and it is a product with the concept of pre-production and on-site installation. After the contract signing, pre-design, design approval, and pre-production processes that meet the client's needs are essential. If the site is not large, it takes about two to three months to prepare in advance.