Specific on-site inspection and meeting are required for the installation and construction of Modinex's products, and it is a product with the concept of pre-production and on-site installation. After the contract signing, pre-design, design approval, and pre-production processes that meet the client's needs are essential. If the site is not large, it takes about two to three months to prepare in advance.
Specific on-site inspection and meeting are required for the installation and construction of Modinex's products, and it is a product with the concept of pre-production and on-site installation. After the contract signing, pre-design, design approval, and pre-production processes that meet the client's needs are essential. If the site is not large, it takes about two to three months to prepare in advance.